top of page

Professional Services

IGSHPA ACCREDITED INSTALLER

Ground Loop Drilling & Installation

This is the process of drilling the vertical boreholes and installing the loops that make up the ground heat exchange system. Depending on your project the depth and number of holes will vary. The HDPE loops are grouted in place to ensure no fluid migration and highest possible heat transfer. All state permits are handled by SGS.

20210913_100202.jpg

Interior Tie In & Purge

Once the ground heat exchange system is installed outside and routed into the building, the system is tied into the heat pump or pumps and purged. The purging process removes all air and debris from the system and adds the needed antifreeze. This step in the process is crucial to your system running smoothly and without interruption.

Heat Pump Service

System Maintenance & Repair

If your system is not running correctly or if the ground heat exchanger is damaged we can fix the issue and get your system back up and running.

20210813_163735.jpg
Services: Services
bottom of page